Gone with the wind
The world’s largest Windfarm Installation Vessel (WIV), Pacific Orca, is hoisted in the air ahead of being delivered to Singaporean shipper Swire Pacific Offshore (SPO) at Samsung Heavy Industries’ shipyard in Geoje, South Gyeongsang, yesterday. The ship is capable of carrying 12 3.6-megawatt wind turbines simultaneously. Provided by the company
with the Korea JoongAng Daily
To write comments, please log in to one of the accounts.
Standards Board Policy (0/250자)